
Projects
From the home workshop invention to mass commercialization, S&E Energy Tech as a startup has formed a feabible strategy of FOCUS 1st, i.e. on the segement of hospitality industry. Based on Mr. Mu the founder's industrial resources, more and more S&E CHP solar systems have been installed in hotels, serving hotel customers with reliable and economical hot water supply.

01
Home Workshop Invention
Y/M: 2020.04
GPS location: privacy protection
Capacity: 5 metric tons
Status: in operation
02
Journey-Dunhuang Chain Hotel
Y/M: 2023.01
GPS location: 40.139583, 94.669464
​Capacity: 10 metric tons
Status: in operation


03
Blossoms Building Hotel
Y/M: 2023.07
GPS location: 27.542364, 109.990932
Capacity: 15 metric tons
Status: in operation
04
Hanting Hotel (H World Group)
Y/M: 2023.12
GPS location: 40.024154, 116.418014
Capacity: 15 metric tons
Status: in operation


05
Journey-Yinchuan Chain Hotel
Y/M: 2024.03
GPS location: 38.4584632, 106.2840396
Capacity: 12 metric tons
Status: in operation
06
Tangyuexuan Hotel
Y/M: 2024.07
GPS location: 38.6356971, 109.9883027
Capacity: 5 metric tons
Status: in operation

Limited space for all projects